Batzer Hut Construction – 2

Photo by BCMC; Source: BCMC; Source: North Vancouver Museum and Archives; Date: August 1965.
First end-wall being raised into position during the construction of the Batzer Hut in August 1965.
Photo by BCMC; Source: BCMC; Source: North Vancouver Museum and Archives; Date: August 1965.
First end-wall being raised into position during the construction of the Batzer Hut in August 1965.