An aerial view of the bridge-tunnel, 1967
Quebec Transport Ministry Archives
After opening the bridge-tunnel to traffic, the dry dock will be integrated to the physical environment of the Boucherville Islands. The Charron Island interchange was rebuilt in 2018.