Assembly of a caisson in the dry dock, 1964
Société d’histoire des Îles-Percées
To connect the prefabricated caissons, workers had to be sure that the dry dock was perfectly clean. Steel plates were installed to level the ground.
Société d’histoire des Îles-Percées
To connect the prefabricated caissons, workers had to be sure that the dry dock was perfectly clean. Steel plates were installed to level the ground.